Le Havre 16th Port US
fire pump restoration
Repair of the rear deck
Arrival of a first storage container
thanks to HAROPA
Dismantling and checking port generator injection pump
Various pictures
Work planned for 2024 (10-year technical shutdown: passage in the hold and restoration)
Passage in dry dock
-
High pressure washing of living works
-
Thickness measurements of hull plates
-
Hull repair
-
Replacement of anodes
-
Paintings
dock work
-
Steering gear (photo 1)
-
Grating (photo 1)
-
Rear rail (photo 1)
-
Bar transmission elements (photo 1)
-
Boat deck (photo 4)
-
Clear machine track (photo 3)
-
Fireplace (photos 2 and 3)
-
Windsock (photos 2 and 3)
-
Batayoles (photo 4)
-
Footbridge bridge (photo 5)
-
Fresh water box
Entrée dans les cales de l'EURE prévue
le 24 JUIN 2024 pour 1 durée approximative de 5 semaines