2026

new port cabin facade

Work continues, with the company ARCH replacing the facade of one of the portside cabins and the mooring service installing new mooring lines.

new port cabin facade
new port cabin facade
new mooring lines
mooring service

2026

a complicated but successful year
In short, the actions carried out during the year

- Finalizing the container setup (workbench, electricity, etc.)
- Water connection (containers and tugboat)

- After many hours of work, the port generator pump was restarted.
- Captain's cabin insulation and lining
- Restoration of the footbridge spotlights
- Restoration of the wheelhouse (in progress)
- Painting of all new metalwork components
- Construction and installation of a new gangway (access bridge to the tugboat)

New coupe
Captain's Cabin Dubbing
Cabin veneer
Installation of an outdoor sink
Projector
Projector control wheel
Overview

2025

September 2025, after a very difficult winter of 2024-2025 without electricity or water, the metalwork is now almost complete. The electricity meter is operational on site, but we are still waiting for the connection to the drinking water supply, so we are resuming our restaurant operations.

Openwork after construction

Clearing before and after

Openwork before work
Container cleaning

Cleaning and fitting out of containers

bilge pumping

Pumping out the bilge after the winter storms

Port injection pump repair

Cloning of the port generator injection pump

2024

areas to be probed
hole location
HOLE
HOLE
HOLE

Dry dock work completed, ST488 left the hold on August 13, 2024
It was towed by the Benthos to its new dock.

The ST488 is moved from Quai Renaud to Quai du Brésil at the end of the Pondicherry causeway

Access is possible by LIA bus lines n°9 and 19

plan usst488.jpg
aerial view3.jpg

Red arrow: new location of ST488 (Brazil quay)

New address : 2 quai de l'Escaut 76600 Le Havre

Green arrow: bus access via LIA lines n°9 and 19, Place Léon Carlier stop

Tug works are still in progress (October 2024)

Footbridge being cut
Protective tarpaulin put in place
Protective tarpaulin put in place

November 2024 the restoration continues, the company ARCH is responsible for cutting the bridges while preserving the original structures and installing new sheets

New bridge footbridge sheets
New bridge footbridge sheets
Bridge footbridge cutting
Bridge footbridge cutting
Bridge footbridge cutting
Bridge footbridge cutting
Conservation of the original structures of the footbridge
Conservation of original structures

December 2024 at the end of the Pondicherry causeway, the quay is being organized, we are waiting for the electrical connection and water in order to be able to continue the work on board the ST.
After the arrival of the first 3 containers, we are still waiting for a 4th and perhaps a 5th container.
These containers will allow the Association to store tools and consumables in order to free up space on the ST.

containers 1 and 2
containers 1 and 2
3 containers

Arrival of a first storage container
 thanks to HAROPA

container  arrival
container  arrival
Setting up the container
Left generator
Port side generator injection pump
Control of the injection pump

Dismantling and checking port generator injection pump

Rear deck restoration
Rear deck being repaired

Repair of the rear deck

Fire pump before restoration
Fire pump after restoration
Rear deck restoration
Rear deck mechanism

fire pump restoration

port side view of the tug
main propulsion unit
general view of the tug
staircase to the boat gangway
interior view of the main propulsion unit (connecting rod and piston)
main electrical cabinet
starboard view of the tug
stand at sea days
general view of the tug

Various pictures