Le Havre 16th Port US

fire pump restoration


Repair of the rear deck




Arrival of a first storage container
thanks to HAROPA



Dismantling and checking port generator injection pump



Various pictures














Dry dock work completed, ST488 left the hold on August 13, 2024
It was towed by the Benthos to its new dock.
The ST488 is moved from Quai Renaud to Quai du Brésil at the end of the Pondicherry causeway
Access is possible by LIA bus lines n°9 and 19


Red arrow: new location of ST488 (Brazil quay)
Green arrow: bus access via LIA lines n°9 and 19, Place Léon Carlier stop

Tug works are still in progress (October 2024)




November 2024 the restoration continues, the company ARCH is responsible for cutting the bridges while preserving the original structures and installing new sheets








December 2024 at the end of the Pondicherry causeway, the quay is being organized, we are waiting for the electrical connection and water in order to be able to continue the work on board the ST.
After the arrival of the first 3 containers, we are still waiting for a 4th and perhaps a 5th container.
These containers will allow the Association to store tools and consumables in order to free up space on the ST.